The process can be described as Fully Automatic Workstation. The user must load all components connector into the machine as required and the equipment will automatically detect if all components are correctly placed. Each LED of each nest will light green if OK and the machine screen will also show the status of each component as a visual help. When the user is finish placing all components and the cable with terminal in the indicated position, press start button and the workstation will automatically start the assembly of the connector, processing each nest according to the previously defined coordinates.